APPartment
Guides

A contract with a developer in Israel: what to check before signing

APPartment·16 November 2026·updated 16 November 2026

A contract with a developer in Israel is usually signed on the developer's own form, but many of its terms are limited by law — the Sale (Apartments) Law of 1973 and the Sale (Apartments) (Assurance of Investments of Purchasers) Law of 1974. The first law cannot be contracted out of except in the buyer's favour, and a waiver of delay compensation or of defect repairs made a condition for receiving the keys is void. Still, it is easier to spot a problematic clause before signing than to challenge it afterwards. Below is what to check in the contract and its annexes and which clauses most often lead to disputes.

Guarantees and how you pay

The developer may not receive more than 7% of the price until the buyer's money is secured in one of five ways: a bank guarantee, an insurance policy, a first mortgage in the buyer's favour, a caution note (he'arat azhara) or a transfer of the right in the apartment. The right arises automatically, whatever the contract says. On signing, the developer must inform you in writing of this right, and if the project has no financial accompaniment (livui) from a bank or insurer, it must tell you so in writing before signing.

In a project with bank accompaniment you pay only with vouchers from the payment voucher booklet (pinkas shovarim) into the project account — both your own money and the mortgage bank's money. For each payment the bank issues a guarantee within 14 business days. If the security is a mortgage, a caution note or a transfer of rights, the law ties payments to construction progress, even if the contract sets other dates.

In the contract, check: what type of security is specified, which bank accompanies the project, and that payment is made only by voucher. Details are in the guide on the developer's bank guarantee.

Price, indexation and payment schedule

  • Indexation. As a rule, payments are not indexed. The contract may index no more than half of each payment to the CBS residential construction input price index; the 20% of the price paid on signing is not indexed, so in total no more than 40% of the price. Indexation runs only until the handover date in the contract. Check which base index is used and what share of each payment is indexed.
  • Schedule. See how much is paid on signing, how much during construction and how much at handover, and compare it with your mortgage approval.
  • Late-payment interest. The contract may provide for it, but the rate may not exceed the rate set by the minister, and it applies only if 7 days have passed since the payment date.
  • The developer's lawyer. Its costs can be passed on to the buyer only within the legal cap: for 2026 — no more than 0.5% of the price or 5 915 ₪ (the lower of the two) plus VAT, if the apartment costs no more than 4 642 750 ₪.

All costs on top of the price are covered in the guide on the full cost of a new-build apartment.

Handover date and delay compensation

The contract must state a handover date. If the apartment is not handed over a month after it, the law grants compensation without proof of damage:

Delay after the contract dateCompensation per month
months 2–4rent of a similar apartment
months 5–10rent × 1.25
from month 11rent × 1.5
← swipe the table sideways →

If the contract sets a higher amount, that amount is paid. Payment is due at the end of each month. There is no compensation if the delay is caused by force majeure under the Contracts (Remedies for Breach of Contract) Law.

What to check:

  • whether the contract has a long "grace" period or a list of force majeure events broader than the law — such clauses are worth showing to a lawyer;
  • if the contract is signed before the building permit (heter bniya): from what date the handover deadline runs, whether there is a deadline for obtaining the permit, and what happens if it is not obtained. According to the position of the Sale Law Commissioner, such a contract is usually signed with a condition precedent: it becomes binding once the permit is obtained.

Specification and changes

The specification (mifrat) is a mandatory annex to the contract in a form set by the minister with the approval of a Knesset committee. The developer must fill in every item in detail and accurately and mark items that do not apply. If no specification was provided, the developer is deemed to have undertaken to deliver an apartment of high quality in all its elements.

What to compare: the area and how it is calculated, the apartment and floor plans, materials, kitchen and bathroom fixtures, electrical work, air conditioning, the mamad (safe room), storage room and parking. A discrepancy between the apartment and the specification is a breach of the developer's obligations. A discrepancy that can be found on reasonable inspection must be reported within a year of handover; a hidden one — within a reasonable time after it is discovered. How this is done is explained in the guide on the apartment handover inspection.

Changes: if you waive a priced item in the specification, the developer refunds its price; if you add one, you pay that price. Work beyond the specification is charged at the developer's price list — ask for a written quote before ordering. Area: according to press reports, a deviation of up to 2% is not considered a breach; if the contract allows more, show the clause to a lawyer.

Typical disputed clauses

  • The developer's right to change the project — layout, areas, common property — "at the authorities' request" or "for planning reasons" without the buyer's consent.
  • A handover date with a long grace period or an expanded list of force majeure events.
  • Indexation above the legal cap or from an unfavourable base index.
  • The developer's lawyer costs above the legal cap.
  • A waiver of rights to delay compensation or defect repairs as a condition for handing over the keys, carrying out repairs or transferring rights: such a waiver is void, even if made in writing.
  • Registration deadlines. The developer must register your rights no later than 6 months after the building is registered in the condominium register or after the apartment is handed over, whichever is later.
  • Warranty periods. The inspection period runs from 1 year to 7 years depending on the type of work, and 20 years for the structure; after it — another 3 years of warranty. The contract cannot shorten them: the law cannot be contracted out of to the buyer's detriment. More in the guide on the developer's warranty after handover.
  • Liquidated damages on cancellation — check whether they are the same for both sides.

Frequently asked questions

Do I need my own lawyer when buying an apartment from a developer?

The law does not require it, but the developer's lawyer represents the developer. Your own lawyer reviews the contract, the specification, the guarantees and the payment schedule and negotiates changes. Their fee is negotiable, while the developer's lawyer costs that can be passed on to you are capped by law.

Can the developer's standard contract be changed?

The contract is an agreement between the parties, so changes are possible if the developer agrees; usually the buyer's lawyer negotiates them. Clauses that put the buyer in a worse position than the Sale (Apartments) Law are void even without an amendment.

How much can I pay the developer before receiving a guarantee?

No more than 7% of the apartment price. The developer may receive anything above that only after securing your money in one of the five ways set by law — most often with a bank guarantee for each payment.

What happens if the developer delays handover of the apartment?

If the apartment is not handed over a month after the contract date, the developer pays compensation without proof of damage: from the second month — equal to the rent of a similar apartment, from the fifth — rent × 1.25, from month 11 — × 1.5. The exception is force majeure under the law.

How long is the warranty on defects in a new apartment?

The inspection period runs from 1 year to 7 years depending on the type of work, and 20 years for structural defects. After it, a further 3-year warranty period applies: during it the buyer must prove that the defect was caused by design, workmanship or materials.

What should I do if the apartment does not match the specification?

Notify the developer in writing: a discrepancy visible on inspection — within a year of handover, a hidden one — within a reasonable time after discovery. The developer must be given a chance to repair it; if the defect recurs after repairs within two years, you may repair it at the developer's expense.

When must the developer register the apartment in the buyer's name?

No later than 6 months after the building is registered in the condominium register or after the apartment is handed over — whichever is later. Check that the contract does not set a longer period.

Как купить