What is Tama 38 and what is happening to it in Israel in 2026
Tama 38 (National Outline Plan 38) is an Israeli programme for strengthening old buildings against earthquakes: residents got a reinforced building, a mamad (safe room), a balcony and a lift, and the developer got the right to add floors and sell new apartments. The programme ran from 2005 and is no longer in force: its general term expired on 1 October 2023, and the last extensions in certain cities ended on 18 May 2026. Cities now approve their own renewal plans instead, and pinui-binui remains the route for whole compounds.
How Tama 38 worked
Israeli seismic standard 413 became mandatory in January 1980, so additional rights under the programme went to buildings with a building permit issued before 1 January 1980 that were not built to this standard. Strengthening is expensive, and the state paid for it not with money but with building rights: the developer reinforced the building at its own expense and earned from selling the new apartments.
There were two tracks:
- Tama 38/1 — strengthening the existing building. The developer added up to two floors, could enclose the open ground floor, enlarged each existing apartment by up to 25 m² — including a mamad — and added a balcony and a lift.
- Tama 38/2 — demolishing the building and putting up a new one on the same plot with extra floors. This track was added by an amendment in 2010.
Unanimity was not required: the Land Registry supervisor or a court could oblige an objecting neighbour to sign the deal.
Why the programme ended
The programme worked where apartments are expensive and adding floors pays off, while in the periphery, where land is cheap, the incentives were not enough. In 2019 the head of the Planning Administration announced that the programme would be closed because it was not meeting its goals, and the State Comptroller reached the same conclusion in its 2023 report.
The general term of Tama 38 expired on 1 October 2023. For local committees that received a deferral from the National Planning Council it was extended until 18 May 2026 at the latest, and no new applications are accepted under it now. Over about 20 years some 160 000 apartments received permits under Tama 38.
What replaces Tama 38
The main replacement is Amendment 139 to the Planning and Building Law (July 2022), the so-called "Shaked alternative": local committees approve renewal plans themselves for individual plots with buildings that need strengthening — either reinforcement or demolition and rebuilding. According to Merkaz HaNadlan, as of June 2026 no permits had yet been issued under this route.
In addition, some cities have approved their own plans to replace Tama 38. According to the same publication, they are in force, for example, in Ramla, Yavne, Ra'anana, Hadera, Kfar Saba, Petah Tikva, Beer Sheva and Givatayim, and in Tel Aviv only for quarters 3 and 4. Whether your city has such a plan, check with the local planning and building committee. For whole compounds the main route is pinui-binui.
What it means for buyers
Permits already issued remain valid for their term — according to N12, 3 years, and in some cases they have been extended. In 2025 permits in building-level renewal projects were issued for 15 836 apartments.
If you are buying an apartment in an old building counting on future renewal, check with the local committee which plan applies to the plot: without Tama 38 and without a local plan, renewal may not happen. If you are buying a new apartment in an added floor or in a building rebuilt under Tama 38/2, check the building permit and the Sale Law guarantee.
Frequently asked questions
What is Tama 38 in simple terms?
A programme under which a developer reinforced an old building against earthquakes at its own expense and added safe rooms, balconies and a lift, and in return got the right to add floors and sell new apartments.
What is the difference between Tama 38/1 and Tama 38/2?
Tama 38/1 is strengthening the existing building with added floors and enlarged apartments. Tama 38/2 is demolishing the building and building a new one on the same plot with extra floors.
Is Tama 38 in force in 2026?
No. Its general term expired on 1 October 2023, the last extensions in certain cities ended on 18 May 2026, and no new applications are accepted under it.
Which buildings qualified for Tama 38?
Buildings with a building permit issued before 1 January 1980 that, according to an engineer, were not built to seismic standard 413.
Can an old building be renewed today?
Yes, but no longer under Tama 38: through a local plan that replaced it, through the "Shaked alternative" or through pinui-binui when several buildings are involved. The local planning and building committee can tell you what is available for your building.
What is the Shaked alternative?
Amendment 139 to the Planning and Building Law (July 2022): local committees approve renewal plans for individual plots themselves. As of June 2026, no permits had yet been issued under it.
Источники
- https://library.mevaker.gov.il/sites/DigitalLibrary/Documents/2026/Shilton/2026-Shilton-401-Urban-Renewal.docx
- https://he.wikipedia.org/wiki/%D7%AA%D7%9E%22%D7%90_38
- https://www.nadlancenter.co.il/article/14694
- https://www.bizportal.co.il/realestates/news/article/20033089
- https://www.kolzchut.org.il/he/%D7%9E%D7%93%D7%A8%D7%99%D7%9A_%D7%9C%D7%AA%D7%94%D7%9C%D7%99%D7%9A_%D7%94%D7%AA%D7%97%D7%93%D7%A9%D7%95%D7%AA_%D7%A2%D7%99%D7%A8%D7%95%D7%A0%D7%99%D7%AA
- https://www.mako.co.il/news-law_guide/2026_q3/Article-4f2ce6cda93cf91026.htm
